FRIDAY

Back to Index for “North to Alaska!”

Electrical wires being rerouted around the building site.
Emily can run a screwgun as well as anyone!
John “The Saw Guy!”
John  rips down the last floor timber.
Checking against the plans our supply of 2×6 16′ and 2×6 20′ before framing the Front wall.
2×6 16′ and 2×6 20′ for walls tally sheet.

Back to Index for “North to Alaska!”